Skip to content
ASME U & R Stamp · TEMA · NQA-1 Quality Program Call us: 800-767-9507
Harris Thermal
Products & Services Overview Shell & Tube Heat Exchangers Pressure Vessels / Tanks Other Fabrication Machining / Drilling Repairs
Industries Overview Oil & Gas Chemical Formaldehyde & Resins Pulp & Paper Food Processing Mining & Minerals Power Generation Nuclear Data Centers Water Treatment Sugar Processing LNG General Manufacturing
Capabilities Overview Fabrication Machining Materials Engineering Quality Control Safety Logistics & Shipping
Resources
About About Us Certifications Employment
Contact Get a Quote →
Home / Industry Insights / Industry Standards & Compliance

Industry Standards & Compliance

Posts filed under Industry Standards & Compliance. @elseTechnical guidance on heat exchanger and pressure vessel design, materials selection, fabrication and code compliance.

  1. Postweld heat treatment of pressure vessels: requirements, limitations, and fabrication planning

    Postweld heat treatment of pressure vessels can unsettle a fabrication plan that looked complete on paper. A carbon steel vessel meets its design pressure and temperature, the drawings are approved, and then the owner's specification adds PWHT. With nozzles, saddles and lifting lugs counted, the completed assembly no…

    Pressure Vessels, Industry Standards & Compliance, Materials & Metallurgy

    Read more

  2. Thermal energy storage tanks for data centers: design, stratification, and cooling reliability

    Thermal energy storage (TES) tanks help data center cooling plants store chilled water for use when cooling demand, equipment availability, or operating conditions change. But tank volume alone does not determine how much cooling a system can deliver. Thermal stratification, diffuser performance, usable temperature…

    Pressure Vessels, Industry Standards & Compliance, Industry Insights

    Read more

  3. Clad pressure vessels: when clad construction makes more sense than solid alloy

    A corrosive process may require titanium, a nickel alloy or a high-molybdenum stainless steel at the wetted surface. That requirement applies to the surface the process touches. It does not automatically apply to the full thickness of the pressure boundary behind it. Clad construction separates those two jobs. A…

    Industry Insights, Industry Standards & Compliance, Materials & Metallurgy, Pressure Vessels

    Read more

Ready to start your next project?

Tell us about your application, timeline, and budget — our engineering team will help you get it built right the first time.